A Star Decorators

06 / coatings

Epoxy and polyurethane floor coatings for warehouses and commercial floors.

Epoxy, polyurethane and chemical-resistant floor systems for warehouses, distribution centres and commercial premises. The system is matched to the substrate, the traffic load and how much downtime you can give us.

Floor coatings. A Star Decorators

When this is the right route

  • The existing slab is sound but the surface is breaking down, dusting or failing hygiene checks.
  • Hygiene, chemical resistance or heavy traffic load drives the specification.
  • Downtime is expensive. The programme and cure schedule need to be agreed in writing before mobilisation.

Scope · included

  • Substrate moisture and cohesion testing
  • Shot-blast or diamond-grind preparation
  • Epoxy or polyurethane system selection to load and use
  • Anti-slip aggregate and line-marking where required

Scope · not included

  • Slab repair beyond surface preparation
  • Vehicle access ramp construction
  • Structural floor works

Sectors

  • Logistics
  • Industrial
  • Retail
  • Food & Beverage

Process

  1. 01

    Survey

    Substrate moisture test (Tramex or hygrometer), cohesion check, traffic load assessment, chemical exposure inventory, downtime window. The cure schedule is agreed before specification, not after.

  2. 02

    Specification

    System selected by substrate, load class and use: epoxy screed for heavy forklift traffic, polyurethane for food environments and thermal cycling, chemical-resistant PU where required. Anti-slip aggregate grade specified if needed. Cure schedule set to the system, not the client's preferred weekend.

  3. 03

    RAMS

    Project-specific RAMS including ventilation plan, pedestrian and forklift exclusion zones during application and cure, COSHH for solvent and catalyst components.

  4. 04

    Delivery

    Shot-blast or diamond-grind substrate, vacuum clean, apply primer, lay system coats to specified film build, broadcast aggregate if in spec, cure, line-mark.

  5. 05

    Handover

    As-applied record (product batch, film thickness readings, application temperatures), anti-slip classification where applicable, cleaning and maintenance regime.

Built for the people who buy decorating

Three audiences. One delivery model.

We are a specialist sub-contractor, not a turnkey fit-out outfit. We deliver decorating, spraying, restoration and coatings under main contractors and direct estate teams.

For main contractors

Hands on decorating. On time, every time, snags closed before handover.

Variations priced ahead of the request. Per-store handover record. AFPs delivered on the day they're due. We run the way you run.

  • Active main-contractor framework relationships
  • Variations priced ahead of the request, AFPs on the day they are due
  • Per zone handover record across multi store programmes

For estate + FM teams

Live trading stays live. Restoration before replacement.

Survey to handover without closing the unit. Powder-coat restoration with a 5-7 year service life. Run-off, masking and reopening tracked store-by-store.

  • Out-of-hours + phased delivery on rolling estate programmes
  • Photo-led handover record per store / per elevation
  • DOFF, chemical and jet-wash cleaning ahead of any coating

For retail estate leads

Brand consistency, store by store, on the date you promised.

Brand-matched paint stacks against the estate spec. KPI reporting per store. Programme that survives shopfit slippage instead of inheriting it.

  • Multi-store rolling programmes. KPI reported nightly
  • Brand-matched Dulux Trade specifications
  • Repeat-work relationships across Primark · Tesco · M&S

How we deliver

Built for live UK sites.

Twenty years finishing commercial buildings across the UK. Director led, directly employed crews, one programme and one point of contact from survey to handover.

01

Live trading hours

Stores stay open. Surveys, masking and run off planned around foot traffic.

02

Out of hours nights

Night programmes on retail and hospitality estates. Clean before doors open.

03

Phased estate rollouts

Rolling 4 to 12 stores a week against a national programme.

04

UK wide coverage

Offices in Poole and London. Crews mobilised across England, Scotland and Wales.

05

Single source delivery

Decorating, on site spraying, powder coat restoration and floor coatings under one PM.

06

Photographic handover

Before and after record, gloss readings and written service life on every scheme.

Frequently asked

  • How long is the cure before forklift traffic?

    Walk-on is typically 12-24 hours. Forklift-ready is typically 5-7 days, depending on system and temperature. Confirmed in writing per scheme.

  • Can you include anti-slip?

    Yes. Aluminium oxide, glass bead or quartz aggregate broadcast into the topcoat. Slip-resistance rating to the specified class.

  • Will it survive heavy forklift traffic?

    Yes, with the right system. We specify to the actual traffic load class, not a generic warehouse spec.

  • Can it be done over a weekend?

    Some systems can, some can't. It depends on substrate moisture, ventilation and the cure rate. We agree the realistic handover at survey, based on the actual cure time.

  • What warranty comes with the floor?

    System-dependent. Most schemes ship with a manufacturer-backed warranty where we are the approved applicator.

Start a conversation

Send photos, drawings or a short scope.

We will review the service route, access, preparation, finish and likely next step before the job is priced properly.

CallGet a quote